⚠️

Caution: Changes Affect Future Pricing

Any changes made on this page will immediately affect all future customer quotes and orders. These changes cannot be undone and will impact pricing calculations across the entire system. Please verify all values carefully before saving.

?
Cost Controls Guide

Quote Variable Types

  • Resin: Cost per pound of raw material
  • Color: Cost per pound for color additives (applied with letdown rate)
  • Tape: Cost per foot for tape application
  • Reel: Calculated using formula: (Flange × 2) + (Reel Type × Size Multiplier)

Price Tiers

  • Multiplier is the final markup factor (e.g., 1.35 = 35% markup)
  • Each customer is assigned a tier that determines their pricing
  • Higher tier numbers = higher markups for lower-volume customers

Reel Cost Calculation

  • Select a Reel variable to see the calculator
  • Enter Flange Cost, Reel Type Cost, and Size Multiplier
  • Factor updates automatically - shown in red if different from current value

Quote Variables

Select a variable to view description
The cost factor for this variable

Price Tiers

Select a tier to view description
Stored as final multiplier (e.g., 1.05 = 5% markup, 1.35 = 35% markup)
-

Reel Configuration Management

Manage reel capacity configurations by pipe size. Select a pipe size to view and edit its reel type configurations.

Variable Management

Manage quote variables: hide/show visibility, add new variables, edit titles/descriptions, or remove variables. Note: LetDown variables cannot be hidden (always active).

📋

Select a variable type above to manage variables